Design for belt conveyor on the two expansion cylinder gear reducer. Transports a continuous one-way
operation, load changes, the no-load starting, roll efficiency of 0.96 (including its supporting bearing the
loss
of
efficiency),
reducer
small
batch
production,
using
the
period
of
8
years
(300
days
/
year),
two
shifts of work, transport permissible speed error of 5%, the workshop three-phase AC voltage 380/220V
Design for belt conveyor on the two expansion cylinder gear reducer. Transports a continuous one-way
operation, load changes, the no-load starting, roll efficiency of 0.96 (including its supporting bearing the
loss
of
efficiency),
reducer
small
batch
production,
using
the
period
of
8
years
(300
days
/
year),
two
shifts of work, transport permissible speed error of 5%, the workshop three-phase AC voltage 380/220V
Design for belt conveyor on the two expansion cylinder gear reducer. Transports a continuous one-way
operation, load changes, the no-load starting, roll efficiency of 0.96 (including its supporting bearing the
loss
of
efficiency),
reducer
small
batch
production,
using
the
period
of
8
years